ConDex System utilized to heat boiler make up water from 50°F up to 180°F with recovered energy from boiler exhaust. System recovers 6,800,000 BTU/hr on average with peak recoveries of over 8,000,000 BTU/hr.
ConDex System recovers waste heat from three boilers and reapplies the energy to heat incoming boiler water from 107°F to 177°F. System recovers 2,744,000 BTU/hr on average with peak recoveries of over 3,900,000 BTU/hr.
ConDex condensing economizer system utilized to recover waste energy from boiler and gas turbine exhaust. Unique "Dual-stage" heat recovery unit heats boiler make up water from 40°F up to 190°F and also heats loop water up to 210°F for the absorbtion chiller process. System recovers 10,000,000 BTU/hr on average and peak recoveries of over 11,000,000 BTU/hr.
ConDex system recovers waste energy from two boilers with existing economizers and preheats 180 GPM of boiler make up water from 55°F up to 180°F. This system recovers 11,200,00 BTU/hr on average with peaks of over 15,000,000 BTU/hr.
ConDex system utilized to heat boiler make up water from 55°F up to 187°F with recovered energy from multiple boilers exhaust gas, after economizers. System recovers 7,800,000 BTU/hr on average, with peaks of over 10,000,000 BTU/hr.
ConDex system recovers waste heat from boiler exhaust and provides heat for campus district heating loop and boiler make up water. The ConDex system heats the district-heating loop up to 190°F and heats boiler make up water from 60°F to 195°F. The system recovers and reapplies over 6,000,000 BTU/hr.
Dual staged ConDex system separately heats both boiler make up water and domestic hot water for hospital. The make up water is heated from 45°F up to 190°F and the domestic water is heated from 45°F up to 140°F. System revocers 5,160,000 BUT/hr on average with peaks of over 7,000,000 BTU/hr.