CLIENT TESTIMONIALS

Things continue to go well with the ConDex System - over 6 million BTU's per hour recovery and basically invisible operation...we're satisfied!

DOW CORNING CORPORATION
Carrolton, KY


"The ConDex System has paid for itself several times over since it's installation. The weekly steam requirement for the feedwater heater has been cut from 800,000 lbs. to 400,000. We love it."

UNILEVER,
Toronto, Canada
 
BUNGE NORTH AMERICA
ConDex system recovers waste energy from two boilers with existing economizers and preheats 180 GPM of boiler make up water from 55°F up to 180°F. This system recovers 11,200,00 BTU/hr on average with peaks of over 15,000,000 BTU/hr.

Annual average fuel cost savings: $1,025,000.00
Annual CO2 emission reductions: 6,510 Tons
Annual NOx emission reductions: 4.28 Tons
7,791,000 gallons per year water recovered
Payback: Less than 6 months - Installed

PACIFIC GAS & ELECTRIC - Central Steam Plant
ConDex system utilized to heat boiler make up water from 55°F up to 187°F with recovered energy from multiple boilers exhaust gas, after economizers. System recovers 7,800,000 BTU/hr on average, with peaks of over 10,000,000 BTU/hr.

Annual average fuel cost savings: $696,000.00
Annual CO2 emission reductions: 4,592 Tons
Annual NOx emission reductions: 3.0 Tons
Payback: Less than 1 year

UNIVERSITY OF GUELPH
ConDex system recovers waste heat from boiler exhaust and provides heat for campus district heating loop and boiler make up water. The ConDex system heats the district-heating loop up to 190°F and heats boiler make up water from 60°F to 195°F. The system recovers and reapplies over 6,000,000 BTU/hr.

Annual average fuel cost savings: $535,000.00
Annual CO2 emission reductions: 3,432 Tons
Annual NOx emission reductions: 2.25 Tons
Payback: Less than 1 year

WILLIAM OSLER HOSPITAL
Dual staged ConDex system separately heats both boiler make up water and domestic hot water for hospital. The make up water is heated from 45°F up to 190°F and the domestic water is heated from 45°F up to 140°F. System revocers 5,160,000 BUT/hr on average with peaks of over 7,000,000 BTU/hr.

Annual average fuel cost savings: $480,000.00
Annual CO2 emission reductions: 3,209 Tons
Annual NOx emission reductions: 2.11 Tons
Payback: Less than 8 months